Case Studies

A selection of projects we have completed

Surface preparation, live Gas Compression operations, Offshore Platform
offshore dry ice blasting
offshore dry ice blasting

1,000 man hours saved from the shutdown schedule as the work could be performed during live operations.

  • No encapsulation required
  • No water wash required
  • No risk to surrounding equipment
  • Salts removed
  • WJ-3 cleanliness standard
  • Original profile exposed or 70-80 microns on corrosion
Surface preparation, medium-high temperature pipework, onshore Gas Terminal
on site dry ice production
on site dry ice production

Live line blasting in complex area brought 290% productivity gain.

  • Live line blasting
  • Recoated immediately, further improving productivity
  • Combination of intact coating and medium corrosion
  • Salts removed, no need for water wash
Dive Chamber Blasting & Painting
on site dry ice production
on site dry ice production

Spot corrosion maintenance reduced downtime during strict turnaround schedule.

  • No need for masking or encapsulation
  • Minimal clean up
  • Spot corrosion removal and feathered edges
  • Intact coating sweep blasted to impart surface profile
NGL Tank Roof Blasting
Dry Ice Global
Dry Ice Global

Rope Access Fabric Maintenance in sensitive area.

  • Huge savings in scaffold and encapsulation costs
  • User-friendly and safe rope access solution
  • Coating and blasting side-by-side